CENSUS AND STATISTICS (QUARTERLY SURVEY OF CONSTRUCTION OUTPUT) ORDER
( CAP. 316 sub. leg. F )
|
CONTENTS |
Version Date |
Empowering section | 30/06/1997 | |
Paragraph 1 | Citation |
30/06/1997 |
Paragraph 2 | Interpretation | 30/06/1997 |
Paragraph 3 | Quarterly survey of construction output | 30/06/1997 |
Paragraph 4 | Particulars required to be given | 30/06/1997 |
Paragraph 5 | Persons required to give particulars | 30/06/1997 |
Paragraph 6 | The survey period | 30/06/1997 |
Paragraph 7 | Sampling methods may be used | 30/06/1997 |
Paragraph 8 | Application of order in certain cases | 30/06/1997 |
Paragraph 9 | Date for destruction of schedules | 30/06/1997 |
SCHEDULE | 30/06/1997 |
Empowering section (30/06/1997)
(Cap 316 section 11)
Paragraph 1 Citation (30/06/1997)
This order may be cited as the Census and Statistics (Quarterly Survey of Construction Output) Order.
Paragraph 2 Interpretation (30/06/1997)
In this order, unless the context otherwise requires-
"construction" (建造工程) means any of the following-
"construction undertaking" (建造工程經營) means any undertaking engaged in construction;
"survey" (調查) means the statistical survey referred to in paragraph 3;
"survey period" (調查期) means the survey period specified under paragraph 6.
Paragraph 3 Quarterly survey of construction output (30/06/1997)
A statistical survey shall be carried out by the Commissioner on the expiration of each survey period in respect of construction undertakings in Hong Kong for the purpose of compiling statistics relating to the construction output thereof in the survey period.
Paragraph 4 Particulars required to be given (30/06/1997)
For the purpose of the survey, the particulars specified in the Schedule shall be given in respect of construction undertakings for the survey period and shall be furnished to the Commissioner in accordance with such form of questionnaire as the Commissioner may issue for that purpose and within such period as he may therein specify.
Paragraph 5 Persons required to give particulars (30/06/1997)
The particulars required to be given under paragraph 4 in respect of a construction undertaking shall be given-
Paragraph 6 The survey period (30/06/1997)
For the purpose of this order, the survey period shall be-
Paragraph 7 Sampling methods may be used (30/06/1997)
The use of sampling methods for the collection of particulars relevant to any survey is authorized.
Paragraph 8 Application of order in certain cases (30/06/1997)
This order shall apply in relation to a construction undertaking notwithstanding that it commenced business after the commencement of a survey period or ceased to carry on business during that period.
Paragraph 9 Date for destruction of schedules (30/06/1997)
All completed schedules collected or received by census officers for a survey and all copies thereof shall be destroyed not later than 24 months after the relevant survey period.
Schedule (30/06/1997)
PARTICULARS REQUIRED TO BE GIVEN IN RESPECT OF CONSTRUCTION UNDERTAKINGS
Name, address and nature of activities of the undertaking.
Value of construction work performed at construction sites, at other minor new construction work locations, and at erected buildings and structures, in the capacity of a main contractor or a sub-contractor.
Site and work particulars and value of construction work performed at each site, for main contractors operating at construction sites.